![]() Coordination and documentation of the fast disaster recovery procedures to follow by the first, second (operations) and third level (system engineers) in case of a disaster within the National Bank. Presenting the current status of the application health and pinpointing the issues of past and future DRP's, in comparison to the BIA plan, to the steering committee of the National Bank of Belgium. Day to day scheduling of applications and job streams within TWSd and TWSz.Ĭompany : (independent Contractor via Centric) 03/2008 – 09/2014 Project :National Bank Of Belgium 03/2008 – 09/2014įunction : Operator / Operations Analyst / Project Leader / DRP coordinator Environment : OS/390, Windows (Physical & VMWare), SolarisĠ9/2013 – 09/2014 : Disaster Recovery coordinator & Backup Teamleader of operations : Planning of the different BCP scenario's for 2014. Writing scripts to handle server and service reboots via scheduling. Goal is to convert as many schedules as possible to unix / windows environment. ![]() Introducing monitoring via mainview.Ĭompany : (independent Contractor via Certio) 09/2014 – 11/2014 Project : Delhaize 09/2014 – 11 /2014Įnvironment : OS/390 / Windows (Physical & VMWare) / AIX / OS/400Ġ9/2014 – 11/2014 : Converting of scheduling for windows server upgrades within TWSz and TWSd (Maestro). Introducing and setting up basic monitoring via AutoIT. Acting partly as first line, partly as second line for mainframe. Monitoring of CA7 chains and indirectly also TWS chains. : Monitoring of the core business of Acerta (Mainframe based). Also paying attention in regards to licensing (like impact of licensing on microservices).Įnvironment : CA7 / TWS / Snow / Omnitracker / Mainview / AutoIT / DB2 / IMSġ1/2014. Scheduling and scripting as part of POC to see if the product can meet the requirements.įunction : Application monitoring (APM) prestudy Environment : Dynatrace / New Relic / AppDynamicsĠ2-2017 – 04/2017 : Prestudy for APM tools like Dynatrace / AppDynamics / New Relic as part of a monitoring solution for open system based applications. Interacting with vendors (including pricing, planning, licensing). Technical lead for scheduling and scripting within/for One Automation.ġ0-2016 - 04-2017 : Prestudy for cross-platform job automation solutions as part of Mainframe Offload project. Setting up guidelines and rules for release management via Octopus & Ansible. ![]() Installing CA-Automic on windows servers. One Automation / IWS / Jams / Activebatch / Skybot / Windows Server 2012 R2 / SQL Server 2012 R2 / Powershell / Perl / Dos scriptingġ0-2016 – current : CA-Automic One AutomationĠ4-2017 – current : Drawing the ground rules for batch framework, guidelines for development and scheduling. Overviewing that everything is well documented.įunction : Job Automation Tool prestudy & implementationĮnvironment : Various Job Automation Tools e.g. Making sure that deliverables are met and that risks are taken into account. Interaction with external partners and other departments to incorporate scripts / interfaces into CA- Automic. ![]() Steering a team for the conversion of TWSz (Mainframe) into CA- Automic One Automation (Window/Linux environment). Project is handled on scrum principle and will be migrated into kanban once the NOC has been set up.įunction : Domain Lead TWS to CA-Automic One Automation Environment : Mainframe / Linux / WindowsĠ1-2018 – current : Domain lead for workload automation in a mainframe offload project. Laying ground rules for documentation in Atlassian's Confluence. Exploring monitoring possibilities (Scom / dynatrace / Zenoss / grafana / kibana). Merging mainframe and open systems operators to one team. Įnvironment : Mainframe / Linux / Windows / zenoss / grafana / scom / kibanaĠ7/2018 – current : Technical lead for setup of a network operations center. Company : (independent Contractor via Tobania) 11/2014 –.
0 Comments
Leave a Reply. |